would like to no thank u

hockeytown
hockeytown
Joined: 12 Aug 07
Posts: 9
Credit: 20545
RAC: 0
Topic 193037

if u are running einstein and seti at 50% if one gos down and u did all the work will it still switch over
to the one thats down every 60 mins
thanks and have a goodone
hockeytown

Jord
Joined: 26 Jan 05
Posts: 2952
Credit: 5893653
RAC: 4

would like to no thank u

As long as you have work for that other project, yes.

Else, no. If your Seti result is done and Seti is down, it cannot download more work and thus only Einstein will be crunched for the duration of time until Seti comes back up and gives you work.

hockeytown
hockeytown
Joined: 12 Aug 07
Posts: 9
Credit: 20545
RAC: 0

thanks ageless that was

thanks ageless that was fast
hope it going good your way
hockeytown

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.