What is the "usual" (no manual intervention) time lapse between the completed WU being initially submitted and the time it is "reported"?
It depends. It will be reported on the next contact to get work, when the time is later than 24 hours before the due date, when the user hits update, or if the version is recent enough (I am not certain this is in 4.45) when queue length of time has passed since the WU is completed.
4.72
Predictor
Connect 1.5
I want the "report" to go soonest, but want to know how long it will be if I do not "update".
Thanks.
Set your connect to projects every X to be short. Then this will control the lag.
Actually, no I didn't check
)
Actually, no I didn't check that file. If anyone is interested in knowing when that LHC WU was reported I'll gladly go back and look.
Thank you for the info.
Jim
RE: RE: RE: What is the
)
Set your connect to projects every X to be short. Then this will control the lag.
BOINC WIKI
That answered it for
)
That answered it for me......thank you.