Resources status

Azeem Mir
Azeem Mir
Joined: 5 Aug 05
Posts: 2
Credit: 11293
RAC: 0
Topic 189743

I am running three projects.E@home resource status shows 1(0.5%). While others have 100(49%). How can i set E@home resource to 100(49%).

BarryAZ
BarryAZ
Joined: 8 May 05
Posts: 190
Credit: 325179522
RAC: 14087

Resources status

Choose the Your Account option at the home page, feed it your account key (matching the one emailed to you when setting up your Einstein account). Then choose preferences (you'll see a reference to changing resource share), choose that and you should be able to reset the resource share. Something must have changed it -- the default is 100.

Azeem Mir
Azeem Mir
Joined: 5 Aug 05
Posts: 2
Credit: 11293
RAC: 0

I have solved the

Message 15829 in response to message 15828

I have solved the issue

Thanks a lot

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.