// DBOINCP-300: added node comment count condition in order to get Preview working ?>
obsidian
Joined: 8 May 05
Posts: 55
Credit: 2250121
RAC: 0
1 Jul 2008 6:39:19 UTC
Topic 193739
(moderation:
)
i have two workunits on my pending credit list for which i have gotten credit, but they are still on the list. the pending credit is also less than the credit i got.
i have two workunits on my pending credit list for which i have gotten credit, but they are still on the list. the pending credit is also less than the credit i got.
The Pending credits list could be a cached list and out of date, allow some time and recheck. Anyway, better this way (credit granted but result still in pending credits list ) than the other way round :-)
CU
Bikeman
correction, my computer is the one with the "validate error" something happened that ruined three workunits, and two of them are stuck on my "pending credit" list. should they have ever been on my "pending credit" list?
pending credit
)
The Pending credits list could be a cached list and out of date, allow some time and recheck. Anyway, better this way (credit granted but result still in pending credits list ) than the other way round :-)
CU
Bikeman
i see that the server sent
)
i see that the server sent both workunits to three users. the first user of each had a validate error.
correction, my computer is
)
correction, my computer is the one with the "validate error" something happened that ruined three workunits, and two of them are stuck on my "pending credit" list. should they have ever been on my "pending credit" list?