FP estimate is the expected number of floating point operations for a given task (estimated runtime from the project). FP bound is the maximum number of operations that will be performed before the task is automatically aborted.
In addition, exceeding the FP bounds usually manifests itself as an abort due to Max CPU time exceeded (derived from the FP bounds and the FP benchmark).
FP estimate and FP bound
)
FP estimate is the expected number of floating point operations for a given task (estimated runtime from the project). FP bound is the maximum number of operations that will be performed before the task is automatically aborted.
BOINC WIKI
BOINCing since 2002/12/8
Thank you. That means "FP
)
Thank you.
That means "FP estimate" is proportional to the time the Computer will probably take to compute the result, right?
Correct. In addition,
)
Correct.
In addition, exceeding the FP bounds usually manifests itself as an abort due to Max CPU time exceeded (derived from the FP bounds and the FP benchmark).
Alinator