Rig 9914 has 3 WU's left to complete. This means that I have 16 and 1/2 hours of crunch left. My cache is set for three days. I connect every other day to upload completed work. I expect two days of crunching to be uploaded at that time. This latest brush with some crap(trap)code on one of the servers means that 9914 will run dry well before my next scheduled upload session. This is not a box that has been updated or otherwise modified since attaching to the project. This evening I uploaded what I could to the "server" (hoping to recive a full pull)and was informed that my quota of 8 WU's prevents me from participating in the project beyond the next 16 hours. What is the value to Einstein to cripple crunching? This rig has hauled some WU's since January. So now it has cancer?
Copyright © 2024 Einstein@Home. All rights reserved.
Da Bug of 8 be back Ack
)
If any admins check this thread, the WU's in question are drop dead in the 18 to 20 June dates. I have two other rigs showing similar symptoms. Could the project be over running itself? Anyone else in this drop dead zone?