We found that we need to split the current S5R3 run at 800 Hz frequency (read more about it in [url=http://einstein.phys.uwm.edu/forum_thread.php?id=6453]this[/url] forum thread)

We found that we need to split the current S5R3 run at 800 Hz frequency (read more about it in this forum thread). We are currently ~6 days away from the end of the lower half, which means that we are experiencing the usual workunit-cleanup at the end of a run, with the common raise of downlaod traffic during that time. Dial-up users may want to suspend the project for the next days.