Here is the result with P2030.20101106.G45.35+00.64.C.b0s0g0.00100_3496_1
Strange thing : When I start it, it run from 11 hours and stick at 37% the last checkpoint is about +- 15 minutes. But if the WU stop to calculate ( calculate wih another project for few moment ) when he come back, the time drop to +- 6 hours but now le % complete move up normally.
Here is the result with
)
Here is the result with P2030.20101106.G45.35+00.64.C.b0s0g0.00100_3496_1
Strange thing : When I start it, it run from 11 hours and stick at 37% the last checkpoint is about +- 15 minutes. But if the WU stop to calculate ( calculate wih another project for few moment ) when he come back, the time drop to +- 6 hours but now le % complete move up normally.